Five stakeholder groups. Five concrete next steps. Each pathway can be pursued independently and in parallel.

🏦 Pathway A · Lending Bank

Standard commercial term loan with 1.50× physical-asset collateral, DSCR above bank minimums, and a live Excel financial model available for credit review.

Specific ask: ₱12M term loan · 8.0% fixed · 8-year tenor with 12-month grace

🇵🇭 Pathway B · Government Agency

Response to the national fuel-security call. No grant requested. DM-XTech asks for policy recognition, RA 9513 certification, and Phase 3 co-investment discussion.

Specific ask: RA 9513 registration · DOE biomethane registry entry · Phase 3 LOI

🌾 Pathway C · Landowner

Turn idle paddy, fish pond, or marginal wetland into stable peso income for 20 years. DM-XTech handles all cultivation; the owner simply receives rent, CPI-indexed.

Specific ask: 0.5–5 ha of shallow-water land within 8 km of a planned hub

🏠 Pathway D · Household Customer

Keep your existing LPG stove, regulator, and cylinder rack. Subscribe to DM-X cylinder swap in participating pilot areas starting Q4 2026 — same monthly cost, peso-stable.

Specific ask: Join the Q4 2026 cylinder-swap pilot waitlist in Metro Manila and Bicol

🤝 Pathway E · Strategic Partner

Development finance institutions, climate funds, and infrastructure investors interested in the Phase 3 Bicol 525-ha scale-up or national replication programme.

Specific ask: Phase 3 co-investment discussion · Gold Standard VER off-take terms

Transparency · Done vs. Needed

A credible ask is always preceded by credible commitment. DM-XTech is not approaching partners cold — there is substantial proponent equity already deployed and operating.

Already CommittedWhat We Need
₱5M+ proponent capital in 18 reinforced-concrete tanks (replacement value ~₱4.5M)₱12M from lending bank — term loan at 8% fixed, ring-fenced to Phase 1 gas-processing CAPEX
16 tanks active with azolla · 2 being converted to sealed biodigestersRA 9513 from DOE — Renewable Energy Act certification and biomethane registry entry
525 ha Bicol land held with clean title114 ha from landowners — cumulative leased area within 8 km of urban hub by Year 5
12-section Engineering Design Document completeQ4 2026 pilot waitlist sign-ups from Metro Manila households
8-sheet live Excel financial model (515 formulas)Phase 3 indication of interest from strategic partners — co-investment, VER off-take, or data-room access
~₱5.5M of complementary equipment on-site (genset, HDUs, hatchery pools)Independent engineering review and vendor performance guarantees

Document Index

This multi-page document covers all standard due diligence categories for both a commercial loan application and a government policy submission.

#SectionContentFor Bank?For Gov?
01OverviewHero, stats, 8 bullet points, executive summary✔ Core✔ Core
02PropositionValue chain, stakeholder benefits, national scale✔ Core✔ Core
03TechnologyBiodigester, PWS, compression, safety, mass balance✔ CoreReference
04EconomicsCAPEX, OPEX, 5-yr P&L, DSCR, IRR, sensitivity, covenants✔ PrimaryAnnex
05PilotSite status, commissioning plan, permit roadmap, scale bridge✔ Core✔ Core
06ResilienceEnergy security, carbon credits, forex retention, Hormuz scenarioContext✔ Core
07EngageFive pathways, contact, document index, process✔ Primary✔ Primary

Contact & Engagement Process

DM-XTech responds to all qualified inquiries within two business days. For bank and government pathways, the response includes an NDA-ready data room link.

ChannelAddressUse ForResponse Time
📧 Email · Banks & strategic partnerspartnerships@dmxtech.co.ukPathways A & E2 business days + NDA/data room
🏛️ Email · Government submissionspolicy@dmxtech.co.ukPathway B2 business days
🌾 Phone & SMS · LandownersContact at formal inquiryPathway C1 week callback
🏠 Web form · Household waitlistdmxtech.co.uk/pilot-signupPathway DAuto-confirm + quarterly updates
🌐 Corporate websitedmxtech.co.ukGeneral information

Typical Engagement Process

Week 1: Initial call & fit assessment (30 min)
Week 2–3: NDA signed · data room access (engineering design, BOM, financial model, risk register, collateral schedule)
Week 3–4: Site visit & technical review · on-site inspection of 18-tank pilot
Week 5–6: Term sheet / LOI / MOU draft
Week 8–10: Documentation & close · target drawdown within 90 days of term-sheet signing